Hello Experts,
I have purchased commodity futures Prd Type / TType / Flow Type - 70D / 400 / 1500.
Flow type for purchase open futures is 1500 and update type is DE1500.
After saving deal, i settled that deal in FTR_EDIT. Position value date is 07.08.2013 and contract expiry month is September 2013.
Now I maintained FW17 rate for the future class and executed TPM1.
System gave error - Unfixed Business transaction exists. However, I have unticked update DE1500 for relevant to accounts. Also I have unticked "relevant to posting" in flow type setting.
Inspite of this, why is system asking for fixing the business transactions (i.e TBB1).
Issue is: Why I need to do TBB1 before TPM1 inspite of these settings.
Please refer attachment for the settings and output.
--
Deepak